Double-leaf gate with pedestrian gate and fencing

We are pleased when clients choose us even when replacing old gates and barriers with new ones. In this case, we manufactured and installed a turnkey double-leaf gate, barrier and fence parts for the client. The products were delivered with stainless steel hardware and a lockable lock. We anchored the entire project to our anchoring posts. The fence parts were already attached to the anchor posts at the factory due to the impossibility of attaching them on site. We tuned the project to a chocolate brown color in a lamellar design.

Client: František H.

Location: Šuňava

Date: 12/05/2023

Order from the customer

The client contacted us with a request to exchange old products for new ones. In the first step, based on the obtained information, we prepared a free customized offer for the client. After mutual agreement, a personal meeting took place on the spot. During the meeting, we measured the openings, we agreed with the client on the placement of the products. Since it was a clean opening without anchoring walls, it was also necessary to supply anchoring columns. In this case, the dimensions of the products can be adjusted according to consideration, but at most to the width of the clean opening. After agreeing on all the details, we put the project into the production process.

01.

Dimension of holes

Double-leaf gate – 5140mm x 1800mm

Pedestrian gate – 1000mm x 1800mm

Fence panel  – 500mm x 1800mm

Fence panel  – 300mm x 1800mm

02.

Pattern

03.

Color

RAL 8017 JŠ

04.

Accessories

Cover system

Stainless steel fittings

Project realisation

In the first step, we processed the production documentation. In such cases, if we do not supply concrete feet for anchoring columns, we send the client documentation on how to prepare these feet. It goes without saying that we can prepare these feet for you thanks to VISIO BUILDING. Subsequently, the project goes through the production process from welding, galvanizing, folding to powder coating. At the moment when the project is ready for assembly, a date is agreed with the client. Assembly usually takes 1 working day. At the end of it, we hand over the project to the client along with instructions for use.

General view

 

Inside view

Mooring

General view

 

Pedestrian gate

Inside view